Candidate: 3E4C7A97

Request Candidate

Overview

I have been with IBEW for 16 years. Positions I have had include General Manager, General Foreman, Foreman, and site superintendent. I am also an operator of heavy equipment, including cranes.

Qualifications

TypeNameStartEnd
Certification TSTC Sweetwater HVAC Certification
High School Graduated Trent High School

Employment History

CompanyTitleStartEnd
Balfour Beatty Foreman 7/1/2014 10/27/2016
. Built light rail systems in Sacramento and Charlotte North Carolina. Also worked on the MUNI system in San Francisco, and on sub stations in the VTA jurisdiction. We reconducted the Sunset tunnel and installed underground conduit, ground grid, cables, and splices on multiple VTA sub station locations. We performed critical lifts and I also went over the third party critical lift plans to look for any deficiencies
Pine Valley Power General Foreman 3/4/2014 7/1/2014
- Pine Valley Power. Worked as General Foreman. Oversaw 3 distribution crews on many different pole change out locations from Fresno, Bakersfield, Oildale, and many other areas with in the PG&E area. Scheduled outages, crane sets, traffic control, manpower, and equipment
Balfour Beatty General Foreman/Foreman 7/2/2013 2/11/2014
. Installed switches, changed out conductors and insulators on existing system for VTA and MUNI in the San Jose and San Francisco areas. All outages were coordinated and performed in short windows between revenue periods so the transit systems wouldn’t lose any revenue. Every one of the outages were successful
Tri-Technic Division Manager 12/11/2012 6/12/2013
. High level meetings with Clients and Potential Clientel. Developed contracts, put on crews, developed tool lists, equipment lists, vendor pricing, safety forms, oversaw the Transmission and Distribution Division, Planned outages and formulated plans to facilitate the different aspects and execution of construction, created subcontractor contracts and oversaw
Hotline Construction General Manager/General Foreman 10/4/2010 12/5/2013
. General Manager/Superintendent/General Foreman. Oversaw Transmission, Distribution and Substation crews, High Level Meetings with Clients and Potential Clientel, Developed Contracts and oversaw every aspect of business in general, in three months we put on 35 crews on PG&E property for distribution work, estimated projects and put qualified personnel in positions to oversee the different regions and divisions.
Kingston Construction General Foreman 8/15/2008 10/20/2010
. General Foreman. Over saw light rail projects in Sacramento area, scheduling and set up of outages, crew make up, prefab components, supervised cutovers and set up an assembly line for the prefabrication process needed for their projects.
Rosendin Electric Site Superintendent/General Foreman 12/21/2005 8/11/2008
-Building wind farm projects from the ground up with total responsibility of the electrical installations and tie ins to the electrical operations of the system.
Wilson Construction General Foreman 3/4/2003 12/16/2005
Installed high voltage underground cable, building substations and upgrading existing substations. Connected new and upgraded communications through SCADA.
United Utilities General Foreman 2/12/2002 3/19/2003
-Built power lines, substations and also installed fiber optics for Sacramento California DSL upgrades.
Canus Electrical inspector 12/5/2016 5/1/2017
Oversee contractors in every aspect of electrical construction and give suggestions on building and installation practices.